Free UK pricing guide

Roofer day rate UKWhat you should actually be charging

Two calculators for UK roofers: the day rate your business needs, then a roof job price that includes access, scaffolding, skips, materials and margin.

How to work out a roofer day rate in the UK

Every reliable UK day rate comes from the same three numbers: the money you need to take home in a year, your business overheads for that year, and the number of days you can genuinely charge for. Divide the first two by the third and you have the minimum you can work for without going backwards.

(annual take-home + annual overheads) ÷ billable days = day rate

Overheads means van, fuel, insurance (including working at height cover), tools, harnesses and testing, accountancy and phone.

Worked example for a self-employed roofer

Example roofer day rate calculation
Take-home target (a year)£38,000
Business overheads (a year)£12,000
Billable days (a year)195
Day rate needed£256
Hourly equivalent (8-hour day)£32

These are example figures, not a going rate — swap in your own targets and overheads. Rates vary a lot by region, sector and how much of the work is domestic versus commercial.

Pricing a job, not just a day

Once the day rate is right, a job price is labour (days × day rate) plus materials with a mark-up, plus scaffolding, skips, access, plus your profit margin. If you are VAT registered, VAT at 20% goes on top of that total — it is never a discount you can absorb.

What UK roofers get wrong

Start from your income target, not the competition

Undercutting the firm down the road only works if their numbers are right. Work backwards from the money you need to take home, add your overheads, and divide by the days you can genuinely bill.

Be honest about billable days

260 working days a year is fantasy. Holiday, illness, quoting, chasing payments and van maintenance usually leave 200–220 chargeable days.

Price materials with a mark-up

Sourcing, collecting and guaranteeing materials is work. A mark-up on trade price covers the time and the risk of a faulty part you have to return.

Access costs make or break the price

Scaffolding, tower hire and skips are often the biggest line on a roofing quote. Get firm prices before you commit to a figure.

Weather days are real

Rain and wind stop roofing work. Build lost days into your billable-day count rather than hoping for a dry month.

Roofer pricing questions, answered

How do I work out my roofer day rate?

Add up what you need to earn in a year, plus your business overheads, then divide by the number of days you can realistically charge for. Most self-employed trades bill 200–220 days a year once holiday, sickness, quoting and admin are taken out, not 260.

What overheads should a roofer include?

Van and fuel, insurance including working at height, tools, harnesses and inspections, scaffolding relationships, accountancy, phone and waste disposal. Spread the yearly total across your billable days rather than trying to add it job by job.

Do I need to add VAT to my prices?

Only if you are VAT registered. Registration is compulsory once your taxable turnover passes the HMRC threshold in any rolling 12 months, and you can register voluntarily before that. The standard rate is 20%, so check the current HMRC guidance for the work you're doing.

Should I charge a call-out fee or a minimum charge?

A minimum charge covering the first hour plus travel is standard for domestic call-outs. It protects you on small jobs where the travel and paperwork cost more than the work itself.

Stop doing this maths on the back of a receipt

The Job Pricing Calculator saves your day rate, overheads and margin defaults, then prices any job in seconds — included in every plan from £9/month.

See the full calculator

Pricing guides for other trades